Labels
Labels
91 labels
- Relates to platform accessibility
- Assigned to tech-arbi-bom team
- Assigned to Arch-Bom team
- To be put on a team's backlog or wishlist
- PR backports a change from main to a named release.
- PR is managed through 2U's blended developmnt program
- PR cannot be finished until other work is complete
- Report of or fix for something that isn't working as intended
- Code that relates to a specific user and should be refactored and removed.
- PR was closed because the author abandoned it
- Proactive technical investment via refactorings, removals, etc.
- Libraries Overhaul tech work not captured in the stories
- PR author is a Core Contributor (who may or may not have write access to this repo).
- open-craft-grove should create a sandbox environment from this PR
- Pull requests that update a dependency file
- Proposal for deprecation & removal per OEP-21
- Pre-work to determine if an idea is feasible