Skip to content

Milestones

List view

  • No due date
    3/4 issues closed
  • This release includes a battery integration strategy, corrected and completed import of generators and other changes or fixes.

    Overdue by 7 year(s)
    Due by April 17, 2018
    4/4 issues closed
  • The second release brings a restructured code base for easier use of eDisGo #97, run scripts for typical operations with eDisGo #93, as well as small changes and fixes.

    Overdue by 7 year(s)
    Due by March 12, 2018
    7/7 issues closed
  • Very basic version to perform worst-case power flow analysis and estimate on future grid extension cost. Must include - [ ] [Data import](https://github.com/openego/eDisGo/milestone/1) - [ ] PyPSA interface - [ ] Generators import and grid connection - [ ] Cost calculation - [ ] Basic results output **Update** Stuff above is already done. There is still space for improvement, but it works as its implemented. In addition some, tasks from v0.0.2 milestone are already done: features/etrago_timeseries include implementation of the eTraGoSpecs interface and an interface for feedin timeseries in general. The branch features/storage-integration2 includes a really basic storage integration strategy as well as a properly working documentation of RTD. I agreed with project partners to have simultaneous release of eTraGo and eDisGo on the 8th of Dec. Let's complete important task to roundup the release v0.0.1 as much as possible. Please assign/unassign issues accordingly.

    Overdue by 8 year(s)
    Due by December 8, 2017
    26/26 issues closed
  • Stuff that is not crucial but nice-to-have.

    No due date
    9/11 issues closed
  • This release includes a curtailment strategy, updated and corrected feed-in time series, as well as small changes and fixes.

    Overdue by 7 year(s)
    Due by March 22, 2018
    20/20 issues closed
  • At this milestone eDisGo allows for importing a grid topology from Dingo data (pickles).

    No due date
    3/3 issues closed