- Introduction
1.1 Background
[Content from original document] 1.2 Purpose
[Content from original document]
- Terminologies
[Bullet points of terms and definitions]
- Requirements
3.1 Functional Requirements
[ ] Requirement 1
[ ] Requirement 2
[ ] Requirement 3
3.2 Non-Functional Requirements
[ ] Requirement 1
[ ] Requirement 2
- Scope
4.1 In-Scope
Item 1
Item 2
Item 3
4.2 Not In-Scope
Item 1
Item 2
- Request/Response Model
5.1 Request Schema
[Request JSON structure]
5.2 Response Schema
[Response JSON structure]
5.3 Notes
Note 1
Note 2
- System Architecture
6.1 Block Diagram
[Diagram placeholder]
6.2 Sequence Diagram
[Diagram placeholder]
6.3 Performance Metrics
Expected p90 latency: XX ms
Target SLA: XX ms
- Task Breakdown and LOE
7.1 Development Tasks
Task 1 (X days)
Task 2 (X days)
Task 3 (X days)
7.2 ORR Activities
Testing & Validation
[ ] Integration Tests (P1)
[ ] Load Testing - [ ] Document results - [ ] Performance analysis
Infrastructure & Monitoring
[ ] Scaling configuration
[ ] Alarm setup and verification
[ ] Dashboard implementation - [ ] Performance metrics - [ ] Error rates - [ ] Success rates - [ ] Latency tracking
Deployment & Documentation
[ ] Deployment strategy verified
[ ] Rollback plan documented
[ ] Runbook updates - [ ] Troubleshooting guide - [ ] API documentation - [ ] Common failure scenarios - [ ] Resolution steps
Total LOE: XX days
-
Reviewers Reviewer Name Role Status Comments [Name] [Role] [Status] [Comments]
-
Action Items
Action 1 Action 2 Action 3
-
Action Items
Action 1 Action 2 Action 3
-
FAQs Q1: [Question]
A1: [Answer] Q2: [Question]
A2: [Answer]
This template:
Uses hierarchical numbering
Includes metric placeholders (XX ms, XX days)
Provides clear section breaks
Uses tables where appropriate
Includes checkboxes for requirements tracking
Uses code blocks for JSON schemas
Includes placeholder sections for diagrams