-
Notifications
You must be signed in to change notification settings - Fork 2k
Pull requests: openshift/release
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
[art] validate if delivery repos exist in konflux-release-data
#68686
opened Aug 31, 2025 by
ashwindasr
Loading…
Add PR image builds for localmodel controller and localmodelnode-agent
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#68683
opened Aug 30, 2025 by
VedantMahabaleshwarkar
Loading…
NO-JIRA: Fix selinux job ImagePullBackOff failures
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
#68681
opened Aug 30, 2025 by
Phaow
Loading…
WIP: metal: use builtin tests in metal jobs
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#68679
opened Aug 29, 2025 by
bertinatto
Loading…
MGMT-21324: adding presubmit evaluation tests to assisted-service-mcp…
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#68677
opened Aug 29, 2025 by
andrej1991
Loading…
gcp ovn fips 4.20
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#68676
opened Aug 29, 2025 by
skordas
Loading…
WIP: Use podman-in-podman feature to enable unit tests with containeized DB
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#68675
opened Aug 29, 2025 by
tiwillia
Loading…
NO-JIRA: no longer perform Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
rebase
merging from ocp
component repositories
approved
#68673
opened Aug 29, 2025 by
smg247
Loading…
Regression test for aws ipsec test
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#68671
opened Aug 29, 2025 by
skordas
Loading…
OCPEDGE-2087: feat: add ystream upgrade for arbiter deployments
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#68670
opened Aug 29, 2025 by
eggfoobar
Loading…
feat: remove techpreview from tna agent installs
lgtm
Indicates that a PR is ready to be merged.
#68667
opened Aug 29, 2025 by
eggfoobar
Loading…
RHDH Extend wait time for docker image and fix droute entry
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#68666
opened Aug 29, 2025 by
zdrapela
Loading…
Test gsm sync
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#68664
opened Aug 29, 2025 by
psalajova
Loading…
Update PTP e2e nightly times
network-access-rehearsals-ok
#68663
opened Aug 29, 2025 by
nocturnalastro
Loading…
[WIP] Add e2e test for Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
gsm-secret-sync
approved
#68661
opened Aug 29, 2025 by
psalajova
Loading…
[WIP] Testing 4.14.56 failed job
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#68659
opened Aug 29, 2025 by
UdayYendva
Loading…
USHIFT-6033: Simplify scenario sources selection
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#68654
opened Aug 29, 2025 by
pacevedom
Loading…
Add doc about adding new regions to e2e test suite
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#68653
opened Aug 29, 2025 by
roivaz
Loading…
[WIP]Add Internal OVN IPV4 Subnets ci
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#68651
opened Aug 29, 2025 by
wewang58
Loading…
WIP: add QE tests for XPN deployments to support DNS Zones in a third separated project
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#68650
opened Aug 29, 2025 by
jianli-wei
Loading…
MULTIARCH-5608: Added HyperShift MCE IBMZ conformance s390x-mgmt workflow
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
Update maistra/istio builder image
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#68647
opened Aug 29, 2025 by
openshift-service-mesh-bot
Loading…
Previous Next
ProTip!
What’s not been updated in a month: updated:<2025-07-31.